MEADMORE JUNCTION

Meadmore Panel Photos: Robert Churchus
Meadmore Panel

'A' signal box at Meadmore Junction controls all main line movements outside the Diamond Valley 'B' Box area. All train movements from Meadmore Junction, Pine Creek, The Triangle and Murdoch Loop are directed along the intended route by the use of switches with the interlocking driven by relays. All areas on the panel are fully bi directional including the interfacing tracks with Diamond Valley 'B' Box.